PRODUCT:
    Guideway Hydraulic Drifter
   YD30 Guideway H..
   YD50 Guideway H..
   YD80 Guideway H..
   YDQ40 HYDRAULIC..
   YDM40 ROOF BOLT..
    Hydraulic leg drill
   YYTZ28 leg Unit
   YYTZ28-1(B) Uni..
   YYTZ28-2(B) Uni..
   YYTZ28-3/4 Unit
   YYTZ28-6/8 Unit
    HYDRAULIC SILO DRILL
   HYDRAULIC ROTAT..
    HYDRAUL IC LOADER DRILL
   WY-60HL/YYT28-2
    Drifter Video
   YD50
   YD50液压凿岩钻车(二)
   YDM50隧道锚杆钻车
   支腿式液压凿岩机组(一)
   支腿式液压凿岩机组(二)
   石材矿液压凿岩机
   CLJ-1液压掘进钻车
   YG80挖改钻车
    CLJ-1液压掘进钻车
    挖改露天钻车
    挖改锚杆钻车

The following table is the compare of
the pneumatic drill and YYTZ26-5 all-hydraulic rock drill unit


Compare item

Pneumatic drill

YYTZ25-5 hydraulic rock drill unit

Construct preparation

(1)pneumatic drill (contain drill rig)tube and wire(wind water hydraulic oil) miscellaneous, waste a lot of time before and after work. (2)general preparation time need an hour

1)adopt integer design,frame compact,simultaneity the machine mates with track or wheels move conveniently, come under for the hole’s length and depth impact smaller. 2)Need about 20 minutes to arranged

Power consumption

105~150kwh

36~37kwh

Net drilling time

Longest 7 hours 05 minutes Least 4 hours Common 5-5.5 hours

Longest 4 hours 20 minutes Least 1 hours 25 minutes Common 2-2.5 hours

footage

Tiptop month footage 125 m Tiptop day footage 5.5m

Tiptop month footage 203 m Tiptop day footage 8.8 m

Labor sanitation monitoring

Working face with more water fog,visibility low,between the working face 4-5 m can’t see anything.Noise high,between the working face 6-7 m can’t talking

  1. working face clean,can’t see any fog and dust,noise is low than pneumatic drill (2)after testing,the result as follow: Dust:0.26mg/m³
  2. Noise:instantaneous A voice level(LP)88.2~90.1dB(A)

Annotate:
   Tunnel whole length 2470 m section 4 * 4 m², drilling holes 48-50 average hole depth 2.3 m
Afford by China twelfth Water conservancy bureau lotus flower mountain item sector

The following table is the compare of
the pneumatic drill and YYTZ26-4 all-hydraulic rock drill unit


Serial number

Experiment item

YYTZ26-4 hydraulic rock drill unit

Pneumatic drills(four dais)

 

Spare parts
consumption

One

two

three

four

Spare parts consumption(Yuan)

Single drill rig spare parts consumption

1

Five chuck bushing 400yuan

80

160

80

80

Chuck bushing

¥6/84

Impact
piston


3/390

2

Three impact pistons 960yuan

 

320

320

320

Helix nut

¥7/183

Water
acus


21/120

4

One Water pipeconnecting ¥50

 

25

 

 

Water tube cap

¥16/27

cylinder

¥ 1/572

5

Three water switch levers ¥30

10

10

 

10

Ratchet talon

¥20/34

o-ring


32/18

6

Three dustproof rings ¥15

5

5

5

 

Orientation
pin

¥3/4

Pastern
mat


10/17

7

eleven o-rings ¥11

3.00

4.00

3.00

2.00

Tower-type
spring

¥8/16

Gas pincushion

¥5/9

 

Rise ring

¥4/20

 

 

8

Hydraulic oil

60kg=570 Yuan

No calculation

9

Drill rod consumption
Average three metres

The rod break 40cm away from the rod tail three roots 3*90=270yuan
Rod roots conditioning (machining fee) 20roots*8yuan=160yuan

The rod break from the middle of the rod 40 roots 40*90=3600yuan Flotsam callback 900yuan=fact consume ¥2700

 

Achieve digging water covey hole(m)

42.2 m (SK72+326 ~ SK72+368.2)

45.50 m (SK72+280.5 ~ SK72+326+000)

 

The cost of drilling every meter

Spare parts

¥34.17

Spare parts

¥32.83

Electricity consumption

¥42.38

Electricity consumption

¥170.41

Drill rod

10.18

Drill rod

¥59.34

 

total

(Hydraulic oil) +86.73=100.23 yuan

¥262.58

Ultimateness:
    
This hydraulic rock drill drill the hole fast,the working face is clean when drilling,noise is less,repair is easy,power consumption is small, frame compactly, move conveniently,difficult to break drill rod,and so on virtues.
Annotate:
    rock: I genus rock burst;contour 4*4 m²
    China fifth railway office first bureau ZHONG NAN MOUNTAIN water diversion item impresario bureau 2004.7. provide.

 

YYTZ26 all-hydraulic rock drill unit
Every metre hole cost budget


Name

Consumption

Single price

Total price

Remarks

Drill bit

0.033

20(Yuan)

0.66(Yuan)

In front the drill bit diameter is 40mm, drill rod length is 2.5m, rock rigidity is F10-F14.Drilling speed is 4-6 minutes

Drill rod

0.007 M

30

0.21

Electricity consumption

0.2°

0.7

0.14

Hose

0.0016 M

75

0.12

Oil consumption

0.020 KG

8.5

0.17

Spare part

0.0015

200

0.13

Total

 

 

1.43

Pneumatic drill and hydraulic rock drill
Cost budget in 7 m² tunnel
List(1)unilateralism drilling 1000M cost budget


Machine model

main equipment invest(myriad yuan)

Power collocate(kw)

Power station(set)

Drill rig number

Pertain collocate(myriad yuan)

 spare part consumption(myriad yuan)

 Oil consumption
(myriad yuan)

 Drill rod
(myriad yuan)

 Drilling time
(hour)

 Drilling electricity consumption

 103-YT27

   7myriad

 70kw

 1set

 3

  2.5myriad

  1.1myriad

 0.45 myriad

 2.25myriad

 1660hours

 11.5myriad degree

YYTZ26C-3

   9myriad

 22kw

 1set

 3

  1.5myriad

  2.2myriad

  0.9 myriad

  0.9myriad

 1300hours

 2.6myriad degree

Difference amount

  -2myriad

+48kw

  0

  0

   +1myriad

 -1.1myriad

-0.45myriad

+1.35myriad

 +360hours

 +8.9myriad degree

List(2)unilateralism drilling 2000 m cost budget


Machine model

main equipment invest

Power collocate

Power station

Drill rig number

Pertain collocate

 spare part consumption

 Oil consumption
(myriad yuan)

 Drill rod
(myriad yuan)

 Drilling time
(hour)

 Drilling electricity consumption

 103-YT27

  11

 100

 1.5

  3

   5

  2.2

  0.9

  4.5

 3320

  28

YYTZ26C-3

   9

  22

   1

  3

   3

  4.4

  1.8

  1.8

 2600

 5.2

 Difference amount

  +4

 +78

+0.5

   0

  +2

 -2.2

 -0.9

 +2.7

 +720

+22.8

List (3) unilateralism drilling 3000 m cost budget


 Machine model

Main equipment invest

Power collocate

Power station

drill rig number

pertain collocate

 spare part consumption

 oil consumption

drill rod

 drilling time

 drilling electricity consumption

 103-YT27

   13

120

 120

  3

  7.5

  3.3

 1.35

 6.75

 4900

  48

YYTZ26C-3

    9

 22

  22

  3

  4.5

  6.6

  2.7

  2.7

 3900

   8

Difference amount

   +4

+98

+9.8

   0

  +3

 -3.3

-1.35

+4.05

+1000

 +40

    In front the tunnel’s contour holes number is 30,aperture is Φ40mm,hole depth is average 2.13m rock rigidity is F10-F14. Drilling speed is 4-6 minutes

Pneumatic drill and hydraulic rock drill
Cost budget in 14 m² tunnel

List(1)unilateralism drilling 1000M cost budget

 Machine model

main equipment invest

Power collocate

Power station

Drill rig number

Pertain collocate

 spare part consumption

 Oil consumption

 Drill rod

Drilling time

Drilling electricity consumption

 203-YT27

    12

 120

 1

 5

  6

   2

 0.7

 3.7

 1750

  21

YYTZ26C-5

    15

  40

 

 5

  4

   4

 1.5

 1.5

 1250

 4.4

 Difference amount

    -3

 +80

   0

  0

  +2

   -2

 -0.8

 +2.2

 +500

+16.6

List(2)unilateralism drilling 2000 m cost budget

 Machine model

main equipment invest

Power collocate

Power station

Drill rig number

Pertain collocate

 spare part consumption

 Oil consumption

 Drill rod

 Drilling time

 Drilling electricity consumption

 203-YT27

   18

 180

 1.5

  5

  13

   4

 1.4

 7.4

 3500

  52

YYTZ26C-5

   15

  40

  1

  5

   9

   8

  3

  3

 2500

 8.8

 Difference amount

   +3

+1400

 +1.5

   0

  +4

  -4

-1.6

+4.4

+1000

+43.2

List (3) unilateralism drilling 3000 m cost budget

 Machine model

main equipment invest

Power collocate

Power station

Drill rig number

Pertain collocate

 spare part consumption

 Oil consumption

 Drill rod

 Drilling time

 Drilling electricity consumption

 203-YT27

  24

 240

  2

  5

  20

   6

  2.1

  11

52500

 94

YYTZ26C-5

  15

  40

  1

  5

  14

  12

  4.5

 4.5

3750

  14

 Difference amount

  +9

+200

 +1

   0

  +6

  -6

 -2.4

 +6.5

+1500

+80

   In front the tunnel’s contour holes number is 30,aperture is Φ40mm,hole depth is average 2.13m rock rigidity is F10-F14. Drilling speed is 4-6 minutes

Pneumatic drill and hydraulic rock drill
Cost budget in 80 m² tunnel

List(1)unilateralism drilling 1000M cost budget


 Machine model

main equipment invest

Power collocate

Power station

Drill rig number

Pertain collocate

 spare part consumption

 Oil consumption

 Drill rod

 Drilling time

Drilling electricity consumption

 203-YT27

   40

 360

 3

 16

  12

   4

  2

  10

 1660

  60

YYTZ26C-16

   45

 120

 1

 16

   7

   8

  4

   4

 1300

  15

 Difference amount

   -5

 +240

+2

   0

   +5

  -4

 -2

  +6

 +360

 +45

List(2)unilateralism drilling 2000M cost budget


Machine model

main equipment invest

Power collocate

Power station

Drill rig number

Pertain collocate

 spare part consumption

 Oil consumption

 Drill rod

 Drilling time

 Drilling electricity consumption

 203-YT27

  50

 480

 4

16

   25

   8

  4

  20

 3320

 140

YYTZ26C-16

  45

 120

 1

16

   15

  16

  8

   8

 2600

  30

 Difference amount

  +5

+360

+3

  0

  +10

  -8

 -4

 +12

 +720

+110

List(3)unilateralism drilling 3000M cost budget


 Machine model

main equipment invest

Power collocate

Power station

Drill rig number

Pertain collocate

 spare part consumption

 Oil consumption

 Drill rod

 Drilling time

 Drilling electricity consumption

 203-YT27

   60

 600

   5

  16

   40

   12

   6

  30

 4900

 240

YYTZ26C-16

   45

 120

   1

  16

   24

   24

  12

  12

 3900

  45

Difference amount

  +15

+480

  +4

    0

  +16

  -12

  -6

 +18

+1000

+195

   In front the tunnel’s contour holes number is 120,aperture is Φ40mm,hole depth is average 3m rock rigidity is F10-F14. Drilling speed is 4-6 minutes

   